This is the pencil sketch for the poster!
Friday, 5 November 2010
Music
We have customized and edited our music using the program Soundtrack pro. This program is very useful as it allowed us to shorten and length various sections of the music to fit in with our trailer sequence.
Thursday, 4 November 2010
Filming
Our main actress Hannah at the train station filming location!
Our group was fortunate enough to be able to work with an actress from our school; Hannah Howgill. Hannah is very good at drama so it made the process of filming ten times easier as she responded to our instructions very well and produced some really good footage.
We gained permission to film in a local train station which provided a very good setting for our trailer, the overall atmosphere on the day was brilliant. Also at this location we were able to capture still images for the poster and TV listings magazine.
Me (Sophie) using the camera and tri-pod!
Holly, Rachel and I all participated in operating the camera and capturing scenes. We each remembered the codes and conventions of Soap Opera trailers used a variety of different shots in various angles.
When we return back to school after half term we will be editing the footage to create our trailer!
Wednesday, 3 November 2010
When are we filming?
We have designed a filming schedule to know exactly what when and where we are filming! This has been devised by the whole group!
Subscribe to:
Posts (Atom)